|
|
|
|
|
|
|
Rating
Summary:
|
0 out of 5 stars, based on 0 visitors. |
Name:
|
Stairs (19).JPG |
Created
Date:
|
8/22/2010 |
Author:
|
Judd |
Description:
|
A 1/2 inch hole was drilled through the 1 1/2 inch galvanized pipe, and the stair was bolted to the upper deck. The galvanized pipe is threaded through a hole drilled through each tread. A forestner bit with an extension will do this job very well. Be sure the galvanized pipe does not fit too snuggly, as this will be a problem as you thread each tread onto the pipe. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|